
State-of-the-Art Environmental Management Center
Discover Seanogy's advanced facilities designed for safe, efficient, and compliant environmental solutions, including our TSD-certified site in Lipa City, Batangas.
State-of-the-Art Facilities

TSD Certified Facility
Our facility in Lipa City, Batangas, is a Category D, E, and F Hazardous Waste TSD Facility with TSD Registration No.: OL-TR-R4A-10-000278.
Decontamination Mobile Unit (DMU)
Our Decontamination Mobile Unit (DMU) utilizes Sea Marconi's patented continuous closed-loop dehalogenation process (CDP PROCESS®), which is deemed as Best Available Technique in decontaminating PCBs by the Italian Ministry of the Environment, the Territory, and the Seas through the Decree 29/01/2007.
Key Advantages of CDP PROCESS®
Guaranteed Compliance with ASTM Standards
Demonstrated results showing regenerated mineral insulating oil, with quality passing the ASTM D3487-16. Proven track record in achieving PCB-free concentration of less than 2 mg/kg.
Extends the Life of the Equipment
Regenerates mineral insulating oil and removes all physical and chemical contaminants inside the equipment. Prevents equipment from becoming a waste.
Substantial Financial Benefits
No need to buy replacement equipment and replacement mineral insulating oil. No need for separate mineral insulating oil maintenance. Potential revenue from the sale of decontaminated metals and regenerated mineral insulating oil.
Safe and Environmentally Sound
Closed-loop decontamination. Zero emission and effluent. Integrated with effective safety controls.
Minimal Downtime with Onsite and Onload Decontamination
Continuous transformer operation during the decontamination process. Maximum of 8 hours of transformer shutdown for DMU connection and disconnection.