
Our Facilities
Category D, E, and F Hazardous Waste TSD Facility
Discover Seanogy's EMB-registered TSD Facility in Lipa City, Batangas designed for safe, efficient, and compliant environmental solutions, including our TSD-certified site in Lipa City, Batangas.
Our Facility
Category D, E, and F Hazardous Waste TSD Facility

EMB-registered Hazardous Waste TSD Facility
Seanogy's Facility in Lipa City, Batangas is a Category D, E, and F Hazardous Waste TSD Facility with TSD Registration No.: OL-TR-R4A-10-000278.
Facilities and Technologies
Our Decontamination Mobile Unit (DMU) utilizes Sea Marconi's patented continuous closed-loop dehalogenation process (CDP PROCESS®), which is deemed as Best Available Technique in decontaminating PCBs by the Italian Ministry of the Environment, the Territory, and the Seas through the Decree 29/01/2007.
Technology
Key Advantages of CDP PROCESS®
Guaranteed Compliance with ASTM Standards for Mineral Insulating Oil
- • Demonstrated results showing regenerated mineral insulating oil, with quality passing the ASTM D3487-16.
- • Proven track record in achieving PCB-free concentration of less than 2 mg/kg.
Extends the Life of Equipment
- • Regenerates mineral insulating oil and removes all physical and chemical contaminants inside the equipment.
- • Prevents equipment from becoming a waste.
Substantial Financial Benefits
- • Extends the life of the existing equipment and mineral insulating oil.
- • Simplified mineral insulating oil maintenance.
- • Potential revenue from the sale of decontaminated metals and regenerated mineral insulating oil.
Safe and Environmentally Sound
- • Closed-loop decontamination facilitating resource conservation and minimization of waste.
- • Zero emission and effluent.
- • Integrated with effective safety controls.
Minimal Downtime with Onsite and Onload Decontamination Process
- • Continuous transformer operation during the decontamination process.
- • Maximum of 8 hours of transformer shutdown for DMU connection and disconnection.